Projectile DEPARTMENT BUILDOUT
Restoring supply. Building internal capability. Delivering production under pressure.
Emergency operational buildout | Full-scope execution
The Situation
Primary bullet supplier shut down without warning
Immediate risk of production stoppage
No internal casting capability in place
Zero infrastructure, equipment layout, or trained personnel
Urgent demand from ownership to restore supply
What Was Done
Department Creation
Converted unused space into a fully operational casting facilityInfrastructure Buildout
Coordinated HVAC, ventilation, and electrical under tight constraintsProcess Development
Designed casting workflows, quality standards, and production methodsTraining & SOPs
Trained personnel and built all operational documentation from scratchVendor Execution
Leveraged relationships to accelerate equipment, materials, and install timelines
Strategic Impact
Eliminated dependency on external casting suppliers
Restored production continuity under urgent conditions
Created long-term internal manufacturing capability
Increased control over quality, cost, and output
Delivered sustained efficiency gains beyond original supplier performance
Key Results
Bullet supply restored in weeks
Fully operational casting department built from zero
300% efficiency vs previous supplier
Internalized critical supply chain function
Closing
Built under pressure. Delivered without delay.
Operational capability where none existed.